You've Built the MVP. Now What?
Congrats — you have a working prototype. Your AI tool helped you build something in a weekend that would have taken months a few years ago. Features work. The UI looks decent. You showed it to three friends and they said "this is cool."
But between "this is cool" and "here's my credit card" sits a checklist of production requirements that no AI tool will tell you about. I've shipped 4 products (TourSyncer, Chobhar Inc platforms, and internal tools at the VA). Here's every step you need.
The Pre-Launch Checklist
✅ Authentication & User Management
- Email/password signup with email verification
- OAuth provider (Google at minimum)
- Password reset flow that actually works
- Session management with proper expiration
- Rate limiting on auth endpoints (prevent brute force)
- Account deletion (required by GDPR/CCPA)
- Terms of Service and Privacy Policy acceptance on signup
✅ Database & Data Layer
- Indexes on all frequently queried columns
- Foreign key constraints and referential integrity
- Database backups configured (daily minimum)
- Migration strategy documented and tested
- Sensitive data encrypted at rest
- Connection pooling configured for production load
- Data validation at the database level (not just frontend)
✅ Security Hardening
- All API keys in environment variables (never in code)
- HTTPS enforced everywhere
- Security headers configured (CSP, HSTS, X-Frame-Options)
- Input sanitization on all user inputs
- File upload validation (type, size, content)
- SQL injection prevention (parameterized queries)
- XSS prevention (output encoding)
- CORS configured correctly (not
*) - Dependency audit (
npm audit) with zero critical vulnerabilities
✅ Payments (If Applicable)
- Stripe integration with proper webhook handling
- Webhook signature verification
- Subscription lifecycle handling (create, update, cancel, failed payment)
- Invoice/receipt generation
- Free trial logic (if applicable)
- Upgrade/downgrade flows
- Cancellation flow with optional feedback
- Tax handling configured (Stripe Tax or manual)
✅ SEO & Discoverability
- Unique title tag on every page (under 60 characters)
- Meta descriptions on every page (under 160 characters)
- Open Graph tags for social sharing
- Structured data (JSON-LD) for your content type
- XML sitemap generated and submitted to Google Search Console
- robots.txt configured correctly
- Canonical URLs to prevent duplicate content
- H1 hierarchy on every page
- Alt text on all images
- Page speed: LCP under 2.5s, CLS under 0.1
✅ Performance & Reliability
- Images optimized (WebP format, lazy loading)
- Code splitting implemented
- Error boundaries on all major components
- Loading states for all async operations
- 404 page customized
- 500 error page with helpful messaging
- Caching strategy implemented (ISR, SWR, or manual)
✅ Deployment & Operations
- Environment variables configured per environment (dev, staging, prod)
- CI/CD pipeline with automated tests on every push
- Domain configured with proper DNS
- SSL certificate active and auto-renewing
- Error monitoring (Sentry, LogRocket, or similar)
- Uptime monitoring (UptimeRobot, Better Uptime)
- Database backup verification (test a restore)
- Staging environment that mirrors production
✅ Legal & Compliance
- Privacy Policy page (GDPR/CCPA compliant)
- Terms of Service page
- Cookie consent banner (if applicable)
- Data processing documentation
- Refund/cancellation policy published
✅ Analytics & Growth
- Analytics tracking (Google Analytics 4, Plausible, or PostHog)
- Conversion tracking on key actions (signup, purchase)
- User feedback mechanism (in-app feedback or support email)
- Email transactional setup (welcome, receipt, password reset)
The 2-Week Sprint to Production
Here's how I structure the final push with founders in my vibe coding sessions:
Week 1: Foundation
- Day 1-2: Auth hardening + security audit
- Day 3-4: Database optimization + backup setup
- Day 5: Payments integration and testing
Week 2: Polish & Deploy
- Day 1-2: SEO implementation + performance optimization
- Day 3: CI/CD setup + staging deployment
- Day 4: Final testing + monitoring setup
- Day 5: Production deployment + launch
The Difference Between a Demo and a Product
A demo works when you click the right buttons in the right order. A product works when real users do unpredictable things with real money.
The gap between demo and product is exactly what I help bridge. Every checklist item above comes from something I've either fixed in production or caught before it became a production incident — across the VA, Fortune 500 environments, and my own SaaS products.
Ready to ship? Book a session and let's get your product production-ready.
